Author Topic: Coast Guard Building Doors  (Read 3439 times)

por930

  • Jr. Member
  • **
  • Posts: 80
Coast Guard Building Doors
« on: April 19, 2014, 06:32:04 am »
Hi Umberto,
I noticed that the end doors on the Coast Guard building do not indicate as closed until you are on the 'first concrete pad' in front of the building. If you use the slew controls, you can see where there appears to be a 'magic' measurement at the second concrete pad to activate the visibility of the end doors. Just curious.

Geoff
Geoff

virtuali

  • Administrator
  • Hero Member
  • *****
  • Posts: 51400
    • VIRTUALI Sagl
Re: Coast Guard Building Doors
« Reply #1 on: April 19, 2014, 11:00:32 am »
If you are referring to the animation, FSX has a built-in optimization that turn off every animation after a certain distance.

If, instead, you are referring to part of the objects appearing/disappearing, it's possible it's the LOD optimization, which can be more visible if you use a very wide zoom angle, like 0.30 or less.

por930

  • Jr. Member
  • **
  • Posts: 80
Re: Coast Guard Building Doors
« Reply #2 on: April 19, 2014, 02:18:03 pm »
Hi,
Yes Umberto, you are correct,  it was the LOD set at 0.30. When I made it greater, the doors "appeared"



Geoff